中国的褐煤发电现状 China’s general use of brown coal in power generation 中国电力工程顾问集团公司 China Power Engineering Consulting Group Corporation 24. June. 2008 · Melbourne
中国电力工程顾问集团公司 China Power Engineering Consulting Group Corporation 中国燃煤发电现状 Coal-Fired Power Generation Status
中国电力工程顾问集团公司 China Power Engineering Consulting Group Corporation 现状 Status 煤炭是我国的主要能源,分别占一次能源生产和消费总量的76%和69%,在未来相当长的时期内,我国仍将是以煤为主的能源结构。 Coal, dominant energy source in China, occupies 76% and 69% of each production and consumption of total primary energy nowadays. And in quite a long time in future, coal will still be the main energy source in China.
中国电力工程顾问集团公司 China Power Engineering Consulting Group Corporation 现状 Status China’s coal resource distribution
中国电力工程顾问集团公司 China Power Engineering Consulting Group Corporation 现状 Status 褐煤保有探明资源量1300亿吨。 Brown coal explored available resources is about 130 billion tons in China. Most brown coal are in the northeast area of China.
中国电力工程顾问集团公司 China Power Engineering Consulting Group Corporation 现状 Status 2007年全国煤炭产量约25.23亿t。 In 2007, raw coal production is about 2.523 billion tons. 其中电煤的耗量超过总产煤量的50%。 In which, coal consumption for electric power, higher by 50%. 2010年煤炭生产总量将控制在26亿吨。 By 2010, total coal production will be controlled bellow 2.6 billion tons.
中国电力工程顾问集团公司 China Power Engineering Consulting Group Corporation 现状 Status 2007年全国发电装机总容量为7.13亿kW,火电装机容量为5.54亿kW,约占总容量77.73%。 By the end of 2007,total generation capacity is 713GW, and the fossil fuel power capacity is 554GW,which occupies 77.73% of total capacity. 2007年全国供电煤耗为357g/kWh,比2005年降低9g/kWh。 In 2007, coal rate for power net output is 357g/kWh, lower by 9g/kWh than 2006.
中国电力工程顾问集团公司 China Power Engineering Consulting Group Corporation 现状 Status
中国电力工程顾问集团公司 China Power Engineering Consulting Group Corporation 现状 Status
中国电力工程顾问集团公司 China Power Engineering Consulting Group Corporation 中国的褐煤发电应用 China’s Use of Brown Coal in Power Generation Sub-critical PC Units Large-Scale CFB PC-SC,USC IGCC Coal Drying
中国电力工程顾问集团公司 China Power Engineering Consulting Group Corporation Sub-critical PC Units The total brown coal generation capacity (unit capacity >200MW) is about 13GW. Most are Sub-critical pulverized coal units.
中国电力工程顾问集团公司 China Power Engineering Consulting Group Corporation Sub-critical PC Units The First imported 300MW brown coal PC units had been put in service in 1978 (yuanbaoshan power plant unit 1). The First imported 600MW brown coal PC units had been put in service in 1985 (yuanbaoshan power plant unit 2). The First Localized 300MW brown coal PC units had been put in service in 1994 (shuangliao power plant unit 1). The First Localized 600MW brown coal PC units had been put in service in 1998 (yuanbaoshan power plant unit 3).
中国电力工程顾问集团公司 China Power Engineering Consulting Group Corporation Sub-critical PC Units Two type of coal pulverizing system. Fan mill system. Medium-speed mill system. Most power plant’s pulverizing system are fan mill system
中国电力工程顾问集团公司 China Power Engineering Consulting Group Corporation Sub-critical PC Units The selection of system depends on the brown coal surface moisture content(Mf). Normally , for medium-speed mill system, Mf<19. Recently some project attempt to use medium-speed mill system for Mf up to 26%,which are under construction.
中国电力工程顾问集团公司 China Power Engineering Consulting Group Corporation Sub-critical PC Units Shangdu power plant 4x600MW Brown coal Mt,ar=29.5% Mf=17.3% Vdaf=46.8% medium-speed mill system put in service in Aug, 2006
中国电力工程顾问集团公司 China Power Engineering Consulting Group Corporation PC-SC,USC >10 sets of 600MW super-critical pc unit fueled brown coal are under construction, First will put into service in 2008. 1000MW ultra-supercritical pc unit for brown coal is under developing.
中国电力工程顾问集团公司 China Power Engineering Consulting Group Corporation Large-Scaled CFB By June 2008, 6 units of 300MW CFB which burns brown coal had been put in service. All located in Southwest of China.
中国电力工程顾问集团公司 China Power Engineering Consulting Group Corporation Large-Scaled CFB Kai Yuan Power Plant the first 300MW CFB unit with brown coal . Mt,ar=34.7% Mf=26.6% Vdaf=52.7% Put in service in Jan, 2006.
中国电力工程顾问集团公司 China Power Engineering Consulting Group Corporation IGCC With Brown Coal Feasibility study of IGCC project uses brown coal as feedstock is undertaken in Northeast of China. The Gasifier capacity will be 2000 t/d. Projects are waiting for approvement.
中国电力工程顾问集团公司 China Power Engineering Consulting Group Corporation Coal Drying Feasibility study of brown coal drying technology is undertaken in some projects. To reduce the coal moisture content, so can use medium-speed mill systems. No implemented project in power generation sector.
中国电力工程顾问集团公司 China Power Engineering Consulting Group Corporation Forecast of Power Generation Capacity
中国电力工程顾问集团公司 China Power Engineering Consulting Group Corporation Forecast of Power Generation Capacity by 2010
中国电力工程顾问集团公司 China Power Engineering Consulting Group Corporation Forecast of Power Generation Capacity by 2020
中国电力工程顾问集团公司 China Power Engineering Consulting Group Corporation Prospect of Power Generation By 2010, more than 15GW of new brown coal power plant will be developed.
中国电力工程顾问集团公司 China Power Engineering Consulting Group Corporation 谢谢大家 Thank you!