法国开发署在非洲 和其他地区的工作流程 2007年十月 法国开发署.

Similar presentations


Presentation on theme: "法国开发署在非洲 和其他地区的工作流程 2007年十月 法国开发署."— Presentation transcript:

1 法国开发署在非洲 和其他地区的工作流程 2007年十月 法国开发署

2 目的:将法国开发署的业务与合作伙伴框架文件的方向相结合
法国开发署的工作流程 / 战略周期 __________________________________________________________ 与当地政府就所关心问题展开对话 第一阶段 当地准备 分析其他国际金融组织的战略 起草针对该国的战略(使馆编写) 巴黎的部际委员会/ «绿灯 » 第二阶段 国别战略 法国 与当地政府协商 签署合作伙伴框架文件(DCP) Our project cycle is a standard one, following the classical steps : Identification, Feasibility Studies, Appraisal, Negotiation, Approval, signing of Financial Agreement, Implementation, Evaluation. ((( Identification: project selected by MoF or possibly proposed by AFD Additional studies (eventually) financed by PPF Appraisal: Aide Memoire (conditions for further project processing and negotiation) Negotiation: based on a draft financing agreement prepared by AFD and the comments of the MoF on the Appraisal Aide Memoire Regular supervisory missions of AFD Supervision Aide Memoire (indicating AFD’s recommendations to the MoF) Post Evaluation mission of AFD (at the technical, economic, financial and accounting aspects, in order to appraise the impacts of the project) Participation of the MoF in this Post Evaluation (in order to directly benefit the findings) ))) Just one point : our Strategic Framework forces us to work intensively on the Result and Impact measurements. We would be interested in collaborating with Chinese specialists on this challenging area. 法国开发署 第三阶段 国别战略 目的:将法国开发署的业务与合作伙伴框架文件的方向相结合 与法国开发署的当地合作伙伴对话 国别业务框架 /公开 法国开发署如何开展业务?

3 法国开发署的工作流程/项目周期 法国开发署如何开展业务?
__________________________________________________________ 根据国别业务框架甄别项目 第一阶段 准备 可行性研究报告 预评估 内部委员会/ « 绿灯 » 第二阶段 批准 与项目业主会谈 董事会/签署贷款协议 Our project cycle is a standard one, following the classical steps : Identification, Feasibility Studies, Appraisal, Negotiation, Approval, signing of Financial Agreement, Implementation, Evaluation. ((( Identification: project selected by MoF or possibly proposed by AFD Additional studies (eventually) financed by PPF Appraisal: Aide Memoire (conditions for further project processing and negotiation) Negotiation: based on a draft financing agreement prepared by AFD and the comments of the MoF on the Appraisal Aide Memoire Regular supervisory missions of AFD Supervision Aide Memoire (indicating AFD’s recommendations to the MoF) Post Evaluation mission of AFD (at the technical, economic, financial and accounting aspects, in order to appraise the impacts of the project) Participation of the MoF in this Post Evaluation (in order to directly benefit the findings) ))) Just one point : our Strategic Framework forces us to work intensively on the Result and Impact measurements. We would be interested in collaborating with Chinese specialists on this challenging area. 签署合同(土建/设备) 第三阶段 实施 项目实施 的 跟踪 后评估/反馈 法国开发署如何开展业务?

4 参与方/3个主要参与方 __________________________________________________________
3个参与方的不同角色 融资方 = 贷款方或赠款方 - AFD (开发署从不作为直接实施项目的一方) 业主 = 投资所有人 资金的接受方(国家,城市,地方企业),如接受的是贷款,则亦是还款方 合同方 -- 提供工程,服务或设备的企业 And now, AFD in Asia. First, AFD’s geographical area is defined by French Governement AFD has been working in Viet Nam, Cambodia and Lao PDR for 10 years. In 2004, its mandate has been extended to other countries, like China, Thailand and Afghanistan, and will be extended to India in 2005. Following the 26 December disaster, AFD has been mandated to participate in the rehabilitation and reconstruction assistance to Tsunami-affected Countries, mainly to Indonesia and Sri Lanka. 法国开发署如何开展业务?

5 参与方:其在贷款流程中的角色 __________________________________________________________ 工程、服务 和设备 贷款协议 项目业主 1. 合同方提供发票 2. 业主同意并转发发票 法国开发署 签约方 3. 法国开发署核对发票是否 与项目的支出一致并直接付款给合同方 法国开发署如何开展业务?

6 项目周期/ 阶段1和阶段2 项目业主 法国开发署 谈判 董事会决议 法国开发署如何开展业务? 项目初步想法 向法国开发署当地代表处建议项目
研究报告的工作大纲 甄别项目 研究报告的招标 研究报告的开展 预评估 谈判 董事会决议 签署贷款协议 法国开发署如何开展业务?

7 项目周期/ 阶段2和阶段3 项目业主 法国开发署 提款 项目实施 项目实施的跟踪 项目完工报告 项目完工 法国开发署如何开展业务?
__________________________________________________________ 项目业主 签署贷款协议 法国开发署 提款前提条件满足 招标(工程/设备) “无异议程序” 签署合同 提款 项目实施 项目实施的跟踪 项目完工报告 项目完工 后评估/反馈 法国开发署如何开展业务?

8 采购/招标和提款 ______________________________________________ 法国开发署 招标程序
项目方 审查当地法规是否与国际法规一致 无采购条件贷款 负责采购流程 招标程序 同意程序 准备招标文件 公布招投标 分析投标文件 选择签约方 编写合同 标准文件 上报经济合作与发展组织 无异议意见 签署合同 法国开发署如何开展业务?

9 开发署内部有独立的部门审查并在甄别期将项目分级
采购/控制负面影响 __________________________________________________________ 开发署内部有独立的部门审查并在甄别期将项目分级 没有负面影响 C级 可预见的对环境及/或居民的影响 1.在项目筹备期 影响弱 B级 影响强 A级 一般的环评报告 及补救计划 深入的环评报告及补救计划 2.在决定是否给予贷款的时候 ESUP: E&S upgrading plan 开发署认为补救计划满意,则批准贷款 3.在项目实施期间 对采取的补救措施进行检查 法国开发署如何开展业务?

10 采购/反贪污 国际公约 1997年发布的经济合作与发展组织反对贿赂外国公职人员公约 2003年联合国反腐败公约 法国开发署措施/4大支持:
__________________________________________________________ 国际公约 1997年发布的经济合作与发展组织反对贿赂外国公职人员公约 2003年联合国反腐败公约 法国开发署措施/4大支持: . 在贷款协议和合同中加入与国际公约接轨的条款 . 将这些措施融入法国开发署内部程序并创建独立控制部门 3. 偿还佣金,未来招投标不再考虑该企业 4. 对受贿者的制裁:终止贷款协议 法国开发署如何开展业务?

11 总结 坚实的结构 项目周期 各参与者确认并开展项目 战略周期 保证可持续发展的程序及审查 构建国家对话并便于适应 当地项目方,投资的所有者
__________________________________________________________ 坚实的结构 项目周期 各参与者确认并开展项目 当地项目方,投资的所有者 贷款方法国开发署 执行的合同方 战略周期 构建国家对话并便于适应 合作框架文件,构建法国政府和当地政府之间的合作关系  国别业务框架,圈定法国开发署业务范围,便于当地政府了解 保证可持续发展的程序及审查 分析并修正对环境和居民的影响 与国际法规一致的,详细的程序保证资金的正确使用 法国开发署如何开展业务?

12 谢谢大家 法国开发署