Download presentation
Presentation is loading. Please wait.
1
Cinnabar Peak Presentation 朱砂峰项目介绍
Centerpoint Resources Inc. 加拿大中鉠资源有限公司 Cinnabar Peak Presentation 朱砂峰项目介绍 Province of British Columbia, Canada 加拿大大不列颠哥伦比亚省 Centerpoint Resources Project Team 中鉠资源企划组 Jan. 2015
2
Corporate Summary 公司简介
Centerpoint Resources Inc. is a privately owned company headquartered in Vancouver, BC, Canada 中鉠资源有限公司是一家总部设于加拿大温哥华的私营公司 Incorporated in British Columbia in 2006成立于2006注册于加拿大不列颠哥伦比亚省 Own sizeable coking coal and gold properties within Canada 在加拿大拥有庞大的焦煤及黄金矿床资产 Cinnabar Peak Presentation
3
Project Location 项目位置 Cinnabar Peak is a large coking coal resource, containing an estimated at least 510 million tonnes of coal 朱砂峰大型焦煤矿产资源,估计 约有最少5 .10 亿吨煤。 Coordinates of the center of the Cinnabar Peak coal property are 56°00 N °10W 朱砂峰煤炭矿产中心位置的经纬度为北纬56°00 ,西经122°10 Cinnabar Peak Presentation
4
Transportation and Infrastructure 交通及基础设施
The Cinnabar project covers an area of 251 sq. km. in northeastern B.C. The region has hosted large scale coal mining since The center of the deposit is located 110 km west of the City of Fort St. John, an industrial centre for oil and natural gas, forestry and agriculture. The city benefits from excellent access to infrastructure and is located on the Alaska (Pan- American) Highway and the Canadian National Railway, and also hosts a major regional airport. 朱砂峰项目位于英属哥伦比亚省东北部,覆盖面积251平方公里。该地区自1982 年开始 已有大规模的煤矿开采。矿床中心位于St. John 市以西110 公里,该市是一个聚集石油、天然气、林业和农业一体的工业中心。该市从非常完善的基建设施获益,位于阿拉斯加(泛美)高速公路、加拿大国家铁路上,并且有一个主要的地区机场。 Cinnabar Peak Presentation
5
Transportation and Infrastructure 交通及基础设施
The coal deposit straddles a reservoir formed by two hydro dams within a canyon on the Peace River. The deposit is readily accessible by a major road network on both sides of the lake, and has ready access to electric power, natural gas and water. 该矿床横跨Peace River 河谷内由两个水电坝筑成的水库,因此可通过水库两侧的主要道路网到达矿区。且该矿区现已有获得电力、天然气及水的渠道。 View westward along Dinosaur Lake, from a vantage point above Mt.Johnson.W.A.C. Bennett dam and Lake Williston are in far background. 顺着恐龙湖西望,居高临下俯瞰Mt.Johnson.W.A.C. Bennett 大坝,远处为Williston湖 Cinnabar Peak Presentation
6
Transportation and Infrastructure 交通及基础设施
Electrical power – WAC Bennett Dam Hydro Plant is on the Cinnabar Peak coal property. The capacity is 2,730 megawatts (21st largest hydro electric plant in the world). A second hydroelectric dam (Peace Canyon) has a capacity of 700 megawatts and is also located nearby. 电力-- WAC Bennett 水电站位于朱砂峰项目区,2,730兆瓦容量, 全球排名第21位。附近第二大的和平谷水利大坝容量为700兆瓦。 Natural gas --‐ There is a large active gas field near the coal property 天然气—在矿区附近有大型天然气田。 Water is abundant. There are numerous rivers and lakes within the property. Rainfall is 300mm per year and the snowfall is 2000 mm per year. 水资源丰富:无数河流湖泊,年降雨量300毫米,年降雪量2000毫米 Communities – the Village of Hudson’s Hope (population 1010) is near the eastern boundary of the property. The City of Fort St.John (population 20,000) is a one and half hour drive to the east, and is strategically located on the Alaska Highway, with a major airport. This city is the centre of the provincial oil and gas industry and thereby has industrial support for any coal mine development. 社区- 矿区东邻人口1010人的Hudson’s Hope乡村。向东开车1.5小时为2万人口的Fort St.John城市。 Provincial Highway 29 is a paved road that accesses the Cinnabar Peak coal property. Because of oil and gas exploration, there are numerous roads throughout the area. 通过铺就好的省级29号高速公路可以进入矿区,因为油气 公司的做了很多勘探工作,因此有无数道路通过该地区。 Cinnabar Peak Presentation
7
Railroad and Port 铁路和出海港口
Coal railroad load out would be at Chetwynd, which is located on CN Rail 44 kilometres to the south. From Chetwynd, coal can be shipped to the coal loading facilities at the Port of Prince Rupert (turn around time 45 hours – one way distance 1027 km) or the Port of Vancouver (turn around time 70 hours – one way distance 1091 km). Train capacity is 16,112 tonnes. A coal railroad branch line south east of Hudson’s Hope or coal loading facility near Fort St.John is a possibility. 加拿大CN铁路煤炭装载区将位于矿区以南40公里的Chetwynd小镇。从Chetwynd可以 将煤通过铁路运输到鲁珀特王子港(往返45小时—单程距离1027公里)或者运到温哥 华港(往返70小时-单程距离1091公里)。火车运力为16,112吨。 Hudson’s Hope 东南方 向的运煤支线或者临近Fort St.John 的煤炭装载区都是可能的运输方式。 Port of Prince Rupert vessel time to Shanghai is 232 hours. Loading rate is 9000 tonnes per hour. Stockpile capacity 1.2 million tonnes. Annual capacity is 24 million tonnes. Maximum ship size 350,000 DWT. 鲁珀特王子港船运到上海为232小时。每小时装载速度为9000吨, 储存容量为120万吨。 年吞吐量为2500万吨,最大货船总载重吨位为350,000吨。 Port of Vancouver vessel time to Shanghai is 276 hours. It is the largest coal port in North America. Annual capacity is 33 million tonnes. 温哥华刚船运到上海时间为276小时。此港为北美最大的 港口 ,年吞吐量为3300万吨。 Port of Prince Rupert 鲁珀特王子港 Cinnabar Peak Presentation
8
Tenure 土地使用权 Coal exploration within public lands in British Columbia is governed by the Provincial Ministry of Energy & Mines , who issue coal exploration licences. BC省能源矿产厅管理公共土地上的煤炭勘探,并颁发煤炭勘探执照 The Cinnabar Peak property consists of 10 coal licences and 9 accepted coal exploration licence applications waiting to be approved, totalling 251 square kilometres. 朱砂峰资产包含已经批准的10个煤炭矿权以及9个待批的煤炭勘探执照,总计 251平方公里。 The licences consist of three blocks: a larger block north east of Peace River, a block west on both sides of the Peace River, and a smaller block south of Peace River. 煤炭执照包含3个区块:和平河东北部的比较大的区块,和平河西部的区块以 及和平河南部比较小的区块。 Coal exploration licences will give Centerpoint the exclusive right to explore for coal within their areas. 煤炭勘探许可将给予中鉠公司在该地域内,独家拥有的煤炭勘探权利。 Cinnabar Peak Presentation
9
Cinnabar Peak Coal Licence and Area 朱砂峰焦煤矿权及面积 (Orange桔黄色部分)
Cinnabar Peak Coking Coal Project Licence and Area Map 朱砂峰焦煤项目矿权面积图 Cinnabar Peak Coal Licence and Area 朱砂峰焦煤矿权及面积 (Orange桔黄色部分) Cinnabar Peak Coal Licence waiting area 朱砂峰焦煤待批煤矿权面积 (yellow黄色部分) Coal Licence 矿权 Hectares 公顷 Area No. 地区号 Application No. 申请号码 Hectares 公顷 418431 1446 Area 1 417720 1500 418432 1344 Area 14 417732 418433 1445 Area 15 417735 418434 Area 16 417736 450 418435 1157 Area 2 417719 418436 1444 Area3 417721 418437 1442 Area 4 417722 1200 418438 1292 Area 11 417730 418439 Area 10 417731 418440 721 Total 总计 13029公顷 12150公顷 Cinnabar Peak Presentation
10
Geology 地质 Coking coals of interest for mining at Cinnabar Peak are contained within the Gething Formation, of Early Cretaceous (135 million year old). 朱砂峰可采的焦煤是包含在早期白垩纪(1.35亿年以前)的盖森地层构造当中。 The Gething Formation is 300 to 550 metres thick, containing numerous coal beds. 盖森地层厚度为300到550米,包含有诸多煤层。 At least 21 coal beds extend across the property. 至少21个煤层延展贯穿整个资产。 5 of these coal beds are of major interest for mining, since they are thicker and more continuous. 其中5个煤层非常厚,而且具有很好的连续性,为主要开采煤层。 Panoramic view Gething Formation; western face of the Peace River Canyon below the Bennett Dam. Gething 地层组的全景图;在Bennett 坝下面的和平河谷 Cinnabar Peak Presentation
11
Geology 地质 East Bank section of Gething and Cadomin formations, looking southward from Bennett Dam. Coal beds lie within dark- coloured bands of rock; note consistency of geological structure, and general dip of strata parallel to ground surface. 东岸的盖森(Gething)和Cadomin储层段,由Bennet提坝往东条路眺望。煤床藏于深色横纹里; 请注意地质构造和一般平衡于倾角地层的一致性。 Cinnabar Peak Presentation
12
Geology 地质 Major coals are arranged in two groups: the Upper Coals and the Lower Coals. Upper Coals include the Superior, Trojan and Titan coal beds. Lower Coals include the Grant and Murray coal beds. 主要的煤层分布为两组:上煤组和下煤组。上煤组包含Superior,、Trojan 和Titan煤层。 下煤组包含Grant 和 Murray 煤层。 Coal beds are up to 3.3 metres thick at Cinnabar Peak. Coals greater than 1 metre thick are considered of interest for mining. 在朱砂峰煤层厚达3.3米。煤层厚度超过一米, 被认为有开采利益。 Depth to the coal ranges from 0 to 900 metres. Most of the known coal lies shallower than 600 metres. 煤的深度范围为0米到900米。多数已知的煤层 赋存于地下600米以上。 Dip of the coals is low to moderate (7% to 38%), facing away from the centre of a large anticline. 煤层倾角平缓为中度范围( 7% 到 38%), 背离大的 背斜中心。 Geological Section 地质切面图 Cinnabar Peak Presentation
13
Regional Geology Map 地区地质图
The light brown, the gething formation ,is coal bearing. 此图中的土黄色部分是盖森地层,为含煤地层 Cinnabar Peak Presentation
14
Coal Resource and Quality 煤炭资源和煤质
Speculative resources of coal, in beds at least 1 metre thick, contain at least 510 million tonnes of Coal, of which 420 million tonnes are considered to be within 600 metres of the ground surface. Resource estimation includes an allowance for geological risk, which is decreased within areas which have already been extensively drilled. 。 The Lower Coals are not assumed to extend beneath the Upper Coals. This is a conservative assumption, based on the Lower Coals having fewer boreholes than the Upper Coals. 推测1米以上的厚煤层的资源总量最少为5.10亿吨。其中4.2亿吨被认为是赋存于地下600米以上。 资源估计考虑到了地质风险,而在钻探密集地区,其风险也随之降低。 基于下煤组钻孔少于上煤组,假设下煤组并没有在上煤组的下方延展,而这个假定是很保守。 East Bank section of Gething and Cadomin formations, looking northeastward. 东北方向的盖森和Cadomin层组的东岸切面图 Cinnabar Peak Presentation
15
Coal Resource and Quality 煤炭资源和煤质
Coals with coking ability have been identified as our major exploration targets. Cinnabar Project is estimated to Coals are mostly medium volatile coking coal, with some high volatile bituminous coal in the western part of the property. Volatile matter content decreases to the east, and also decrease downward within the Gething Formation. 我们主要的勘探目标是焦煤。朱砂峰项目预计煤质多数为中度挥发焦煤,西部 区域的煤质为高挥发度焦煤,东部区域以及盖森层组挥发物质成分降低。 Ash of the coal by itself is low, at 3% to 7%. Sulphur content of the coal is low, typically within 0.55% , rarely exceeding 1%. All coal resources are within coal beds considered to have characteristically low sulphur contents. 煤自身的灰分很低,在3%到7%之间。煤的硫分很低,典型的为0.55%以内, 很少 超出1%。 Coals can be blended from within the property, to meet the VM23-25%, ash less than 8% requirement of Asian markets. 可以在矿上就地混煤,以满足中度挥发23-25%, 灰分低于8%的亚洲市场需求。 Cinnabar Peak Presentation
16
Coal Resource and Quality 煤炭资源 和煤质
Cinnabar Peak Presentation
17
Coal quality data from 1971/1973 exploratory work
1971/1973年勘探工作的煤质数据 Cinnabar Peak Presentation
18
SGS Coal quality Analysis in 2010
Cinnabar Peak Presentation
19
Mineability 可采性 Coal geology is not complex and seams are not steep (typically 7%) .Estimated that mining extraction can continue to a depth of 600 metres. 煤炭地质不复杂,煤层不陡峭(基本为7%)。预计开采最深可达600米。 Seams are generally thin but are ideal for underground long wall and short wall mining, and room & pillar extraction. These methods are common in Asia. 采用地下长臂和短臂以及房柱式开采,煤层厚度非常理想。 Five separate mines in different areas could be considered for a maximum total production of 10,000,000 clean tonnes per year for a minimum 25 year mine life. 考虑在不同区域开发5个独立的矿区,年产高达一千万吨精煤,至少25年 的矿山服务年限。 Cinnabar Peak Presentation
20
Conclusion 结论 Centerpoint’s coal property at Cinnabar Peak Consists of 251 square kilometres of coal exploration licence, effectively controlling the most accessible part of a larger coalfield. 中鉠公司的朱砂峰煤炭资产包含251平方公里的煤炭勘探执照,有效地控制了大部分煤田的出入通 道。 Centerpoint’s property is estimated to contain at least 510 million tonnes of coal, of which 420 million tonnes are considered to be within 600 metres of the ground surface. 中鉠公司煤炭资产预计总量最少为5.10亿吨煤,其中4.2亿吨被认为是地表以下600米以内。 Coal resources at Cinnabar Peak are classified as being at the “speculative” level-of-assurance. 朱砂峰的煤炭资源被归类为有保证的“投机”水平 The coal beds have a range of volatile-matter contents amenable to blending to meet Asian requirements for coking coal. 煤层含有的挥发物含量适合混配,以满足亚种对焦煤的要求。 Ash content and sulphur content of the coals are low, rendering them attractive for development. 此煤的灰分和硫分含量比较低,让此种煤炭开发颇具吸引力。 The coal would be workable by underground methods. 此煤采用地下开采方式可行。 The property is well-served by infrastructure, allowing for ready exploration and development. 该区域基础设置配套良好,为项目的勘探和开发做出很好的准备。 Cinnabar Peak Presentation
21
Work Plan--‐ Year 2015 Predevelopment 工作计划—2015年开发准备工作
Main focus: exploration program 主要专注于:勘探工作 Drilling 2 to 4 holes , minimum 600 metres each; Notice of Work has been obtained 钻2到4个钻孔,每个孔至少600米深,目前勘 探许可已批 Coal quality analysis 煤质分析 Estimated cost for exploration in year 2014 $454,011; 预计2015年钻探费用为$454,011加元; Exploration and report development will continue from year 2015 $17,531,000 从2016年开始以及此后开展的钻探工作 及43-101报告撰写费用为$17,531,000 Year 年 Length (Metres) 长度米 Number of holes 钻孔数 2015 1200 2 2016 31800 53 2017 32400 54 Total for Phase 1 总计第一阶段 64500 109 Cinnabar Peak Presentation
22
Year 2015 Planned Exploration Work Map 2015年计划勘探工作地图
The year 2014 exploration area is located approximately 10 kilometres south west of the Town of Hudson Hope (see the below map Cinnabar Peak Phase 1 Exploration) within an area known as Coal License 2014年勘探区域位于Hudson Hope 西南约10公里处(见下图 朱砂峰阶段1勘探图)的煤炭执许可418432区域内 Sites A and C are the preferred drill sites with B and D as backup locations (refer to the Planned Exploration Work map) 右侧地图上A和C为首选钻孔位置,B和D为备用位置 CL:418431 CL:418432 Cinnabar Peak Presentation
23
Work plan –year 2017 & 2018 Exploration 工作计划—2016年开发前工作
Main focus: determine mineral resource for the large easterly block north of the Peace River 主要工作集中于: 确认和平河北部的大型东区块组的资源量 Continue coal analysis 继续进行煤质分析 Conduct mine design parameter work,and begin mine design work 开展煤矿设计参数工作,开始煤矿设计 Capital estimates requirement: 预计资本需要: - rock development 土方 - surface structure 地表结构 - roadheaders 掘进机 - continuous Miners 连续性采煤机 - longwall systems 长臂开采系统 - underground diesel equipment 地下柴油设备 - ventilation system 通风系统 - conveyor systems 皮带系统 Cinnabar Peak Presentation
24
Access into Trial Mine 进入矿山的通道
Cinnabar Peak Presentation
25
Work plan – year 2020 & 2021 trail mine 工作计划—2020年和2021年实验性开采
Main focus: stepping development forward to full production 主要工作:进一步开发以达到全部产能 Year 2020: production at 100,000 tonnes 2020 年:产量达到10万吨 - mine development: rock development continues 矿山开发:继续土方工作 - purchase and install conveyor systems 购买及安装皮带系统 Year 2021: commence production at 1,000,000 tonnes 2021年:开始生产100万吨焦煤 Cinnabar Peak Presentation
26
Thank you 谢谢 Centerpoint Resources Inc. 加拿大中鉠资源有限公司
Centerpoint Resources Project Team 中鉠资源项目组 Jan. 2015 Suite 1055– 1140West Pender Street Vancouver BC Canada V6E 4G1 TEL: Cinnabar Peak Presentation
27
Notes Cinnabar Peak Presentation
Similar presentations