Presentation is loading. Please wait.

Presentation is loading. Please wait.

A introduction to CDM Study Group

Similar presentations


Presentation on theme: "A introduction to CDM Study Group"— Presentation transcript:

1 A introduction to CDM Study Group
Tao wendi, Environmental science Zhou Yangsheng, MBA Wan jinbo, Sustainable Development Yang xin, Environmental law Feng danyang, Technical history Zhang Feifei, Environmental Engineering Zhang xin, Environmental science 介绍小组成员 综合实力~~ 2019/8/14

2 What is CDM? 清洁发展机制(CDM)系 京都议定书第12条确立的机制, 核心内涵是:发达国家通过提供资金和技术的方式,与发展中国家合作,在发展中国家实施具有温室气体减排效果的项目,项目所产生的温室气体减排量作为发达国家履行京都议定书所规定的一部分义务。 2019/8/14

3 Concept CDM is defined by the Article 12 of KP
Key point : A developed country, by providing technologies and financial resources, cooperates with a developing country to implement a project with GHG emission reduction benefits in the developing country, and the GHG emission reductions by the project could be used by the developed country to meet part of its commitment under the KP 清洁发展机制(CDM)系 京都议定书第12条确立的机制, 核心内涵是:发达国家通过提供资金和技术的方式,与发展中国家合作,在发展中国家实施具有温室气体减排效果的项目,项目所产生的温室气体减排量作为发达国家履行京都议定书所规定的一部分义务。 2019/8/14

4 CDM project cycle Design, Structure, Finance National approval
Designated National Authority Validation Operational Entities A Registration Operational Entities B Monitoring Verification & certification Executive Board Issue CERs 2019/8/14

5 CDM projects types General CDM project Small Scale Project
Sink Project (AR) Small Scale AR Project 一般CDM项目:涉及能源、N2O、HFC等的项目Projects related to energy, N2O、and HFC 一般小项目: 碳汇项目:指造林和再造林 小型碳汇项目 一般CDM的基本规则已经达成,可以开始实施 Modalities and procedures for general CDM projects are in place, and can be applied 小项目: 经COP-8批准,已经允许采用简化的模式和程序: Small Scale project: can apply for simplified rules adopted at Cop-8 碳汇CDM:2003年12月COP-9上完成 Sink Project: Rules adopted at COP-9 in December 2003 小型碳汇CDM:预计2004年12月COP-10上完成 Small Scale Sink Project: Rules may be adopted at COP-10 in 2004 2019/8/14

6 Baseline: scenario without CDM project
Problems to be solved Project Baseline X1 X CO2 emissions Baseline: scenario without CDM project Project actual Project projection 基准线的设定:难点[1] (过去几年的研究与实践,已经对如何为项目设置基准线提出了许多观点。这些研究都基于以下两个基本准则: 环境完整性和经济效率。关于环境完整性:基准线当防止不真实的排放削减情况,以免夸大某些工业化线应当防止不真实的排放削减情况,以免夸大某些工业化国家的排放削减效果,造成实际排放量的增加。由于CDM项 目涉及广大的没有减碳义务的发展中国家,如何确保项目具有真实的、额外于发展中国家本身所能实现的温室气体减排效应,这显得更加重要,在国际谈判中也就特别敏感。经济效率主要指的是:管理可行性,政策可行性) 200X time X represents projected avoided tons in a given time period X1 represents CERs for the period 2019/8/14

7 Problems to be solved Monitoring Plan CERs Calculation … CDM实施效果的监督
  CDM项目还必须有一个监测计划以收集准确的排放数据。监测计划构成了未来核实的基础,它必须具有很高的置信度以保证CDM项目的减排量以及其他项目目标确实得以实现。监测计划还应该有能力监控项目基准线及其排放量失败的风险。监测计划既可由项目开发者也可由专门机构制定。排放基准线和监测计划必须根据经批准的方法来设计。如果项目参与者偏好一种新的方法,则该方法必须经由执行理事会批准和登记。项目参与者可以自行选择项目的 CER获得时限:10年;或者7年,但可能延续两次并重新确认基准线(最长21年)。 [1] 王灿、张坤民等,清洁发展机制CDM中的基准线问题,世界环境,2000,(4):9~13 [2] 中国清洁发展机制网,基础知识, 减排量计算 CERs Calculation 2019/8/14

8 2. What is going on in China?
2019/8/14

9 2019/8/14

10 CDM Projects conducted by CREIA
No. Hosting ompany Project Name Total Capacity Investment Estimated Time Life –cycle (year) Annual Power Production/ Energy Conservation Emission Reductions (ton CERs) 1 Inner Mongolia Longyuan WindEnergy Development Company Huitengxile Wind Farm 25.8MW RMB 208 million Put into commission in August, 2008 20 59.44 million kWh 54,136 2 Jilin Mingmen Wind Power Corporation Jilin Taonan 49.8MW Wind Farm Project 49.3MW 435.01million Start construction in 2004, and put into commission in Oct. 10 million kWh 113,521 3 Jianghe Rural Electrification Yunnan Daliangzi Small Hydro Station Project 32MW RMB 165 million Dec., 2005 40 174.8 million kWh 144,000 中国资源综合利用协会可再生能源专业委员会正在执行中的CDM项目清单 企业进入CDM[1]  北京大学光华管理学院在2000年曾对国内一些企业进行过有关CDM的问卷调查,结果显示,国内企业知道CDM的并不多,对CDM的内涵更缺乏了解,并且由于各种经济因素的影响,国内企业目前并不非常关注这方面的影响(北京大学光华管理学院,2000)。   国内的企业对CDM也存在很多疑问,其中最主要的就是CDM能够给他们带来什么?由于国际上对CDM的研究还不够深入,COP虽然早已明确了发达国家可以通过CDM项目获得CERs,发达国家企业必然要参与其中,但支持发展中国家可持续发展只是一个很模糊的概念,到底会给发展中国家企业带来什么影响,目前还不明确。 由于目前中国正处于从计划经济向市场经济的过渡时期,建立一个公平、透明的市场竞争环境是一个主要的努力方向,因此,CDM如何能够在国内企业间公平地开展,也是国内企业非常关注的一个问题。发展中国家政府一直要求CDM必须包括相应的技术转让活动。对CERs的所有权问题也还没有一个明确的政策。如果CERs的所有权归政府所有,国内企业能从CDM中得到什么好处呢?而且,通过什么方式才能调动国内企业参与CDM的积极性? 由于中国经济正处于高速增长阶段,国内企业对先进技术的需求非常迫切,转让正常商业途径无法获得的技术是增强CDM在中国的吸引力的重要措施。中国政府希望CDM项目能够与国内的产业结构调整相配合,因此,CDM可以为采用清洁生产技术的企业提供获得融资的渠道。总之,中国国内企业对CDM的希望,不外呼获得正常商业渠道无法获得的技术,以及增加其获得国际融资的可能性这两个方面。 我们的工作: 选择项目 [1]中国清洁发展机制网,中国企业对CDM的理解, 2019/8/14

11 \ 3.What do we want to do ? 2019/8/14

12 The basic principles and international rules of CDM
A case study about how to develop CDM in China Form a executive policy system to meet the following requirements: Project should bring about GHG emission reduction benefits Project should bring financial resources (Additional to ODA) Project should lead to technology transfer Main Requirements: 环境效益:项目必须带来温室气体减排 Project should bring about GHG emission reduction benefits 项目资金:项目应带来资金投入(额外于ODA) Project should bring financial resources (Additional to ODA) 技术转让:项目应带来技术转让 Project should lead to technology transfer 2019/8/14

13 4.How to make it? 2019/8/14

14 Select a project as a case
Collect information (From website, reference, investigation, government…) Questionnaire survey Data analysis Policy study 选择项目,搜集项目资料,通过项目选择确定案例,通过案例分析探讨在中国使得企业介入CDM发展,实现环境(技术更新和污染物减排)、社会(履行京都议定书,帮助发达国家削减;促进国内部分产业结构调整)、经济(企业从中得到融资技术、有所收益)效益政策条件。(政策分析) 2019/8/14

15 Thank you! 2019/8/14

16 2019/8/14


Download ppt "A introduction to CDM Study Group"

Similar presentations