Presentation is loading. Please wait.

Presentation is loading. Please wait.

far side of the Taiwan STRESS TEST reports

Similar presentations


Presentation on theme: "far side of the Taiwan STRESS TEST reports"— Presentation transcript:

1 far side of the Taiwan STRESS TEST reports
nucLIAR 核騙 far side of the Taiwan STRESS TEST reports

2 Lessons learned from the Fukushima? 福島核災後我們學到了什麼?
Message from Commissioner Kenzo Oshima of Japan Nuclear Regulation Authority in the ENSREG meeting, Brussels, June 11, 2013 2013年6月11日日本原子力規制委員會委員大島賢三在布魯塞爾歐盟核能管制機構委員會中傳達的訊息。

3 If we don’t pay attention – even worse 如果我們不注意,台灣會更慘

4 Taiwan is sitting on this EARTHQUKE CHAIN REACTION 台灣也在這個地震連鎖反應上

5 Even worse – higher density and near distance 甚至更嚴重 – 更高的密度與更近的距離

6 如果還有明天…

7

8 Dr. Tsai Chunhong tearing speech

9 To ask for restart of the broken RV anchor bolts crippled Guosheng NPP

10 in the KMT Party Office in the Legislative Yuan

11 Do you know all NPPs and National Stress Test Reports are prepared by INER of AEC? And the Control Yuan made official report against the kinship between AEC, INER and Taipower. 各位同行審查委員,台灣核電廠壓力測試與國家壓力測試報告,都是由原子能委員會核能研究所(核能監督機構)寫的你們知道嗎?監察院也糾正這種不當行為。

12 Broken Anchor Bolt in the 1st Unit of Guosheng NPP

13 Broken Anchor bolt of 2nd Unit of Guosheng NPP

14 All bolts are related

15 How about the anchor bolts installation in the Longmen NPP?

16 Anchor bolts installation in the Longmen NPP, 2005

17 Incredible MEASUREMENT

18 Incredible MEASUREMENT

19 NICE SHOOT

20 The report was there

21 Report been erased

22 NO TOILET IN THE CONSTRUCTION SITE, PET BOTTLES SHOWN ON THE CONTAINMENT WALL

23 Cut off rebar from the containment wall

24 It happened everywhere…

25 Those THINGS happen here

26 Do you want to know how deep is the rabbit hole?

27 WATER, WATER, EVERYWHERE

28 It can be water-proof??? 循環抽水機是核電廠反應爐重要的設施,結構工程的止水帶就如同防水手錶的密封橡膠環,如果遇到下雨、颱風、海嘯,抽水機房進水,抽水機就會失效,反應爐就無法得到供水,而導而爐心融毀。 從現場照片看來,不但工程㗊質粗糙、隨偒,而且止水帶的材料與水泥混凝土也有很大的問題。

29 If it happened, it will happen again…
所以核四廠經常進水,成了泡水電廠。核四的防水工程都沒有做好,如此明顯的缺失,發生許多次,現在號稱完成了95%,但只要0.0001%的缺失,就會造成核災。

30 Many reports used to here “Violations and Improvement Opportunities”

31 THERE IS NO EVIDENCE FOR EFFECTIVE CORRECTIVE ACTION IN MORE THAN THOUSANDS REPORTS EXCEPT CONSISTANT MISTAKES, VIOLATIONS, HUMAN ERROS, LACK OF TRAINING, MALPRACTICES AND MALFUNCTION ALL TIME… 在上千份的違規、注改事項中,沒有任何有效的改正證據,只有不斷的錯誤重複發生 …

32 Bath Tub Curve of Nuclear Power Plant
核電廠事故的浴盆曲線 Bath Tub Curve of Nuclear Power Plant 核電廠設計壽命30年 失效率 failure rate 夭折 壯年 老年 核二 無限期延役 核四 核三 核一 福島Fukushima 車諾比 Chernobyl TMI 時間 Time

33 Many are missing or erased…

34 WOULD YOU GUARANTEE ANYTHING AFTER THE PEER REVIEW?
Far side of the moon If the peer review team can not read Chinese, how can you find out truth? Or just PAPER REVIW, NOT PEER REVIEW. WOULD YOU GUARANTEE ANYTHING AFTER THE PEER REVIEW?

35 Stop AEC/TAIPOWER lying and hiding
Or, we are witness worst than Fukushima accident in Taiwan getting closer and closer to shut world nuclear industry down? Stop AEC/TAIPOWER lying and hiding

36 CITIZEN WATCHING YOU 取材自公民1985行動聯盟


Download ppt "far side of the Taiwan STRESS TEST reports"