1 CE NVH Team Summary – 2017 Wu, Weidong APRIL 27th , 2017

2 CCI CE NVH - Hardware Test systems Handset sound meter
HEAD acoustics 4-channel system HEAD acoustics 8-channel system LMS Test.Lab 16 channels system LMS Test.Lab 32 channels system Volume source 体积声源 Stethoscope 听诊器

3 Projects 2016 项 目 统 计 综合诊断 29 轻卡 11 江淮,东风,济南重汽,福田,韩国现代 非公路 10
徐工,柳工,现代,山推,PS BUS 3 宇通,中通,桂林大宇 轻客 1 南通艾维克 重卡 2 福田戴姆勒,北奔 扭振 HHP 1,柳工挖机 1 仿真 18 7 HHP 悬置 非公路 3,公路 8 振动分析 68 ECM 31 非公路 11,公路 20 后处理 14 非公路 14 悬置隔振 22 非公路 13,公路 9 合计 115 9/20/2018 Cummins Confidential

4 2017 Highlights Support BFCEC and EARD improve test quality of ISF2.8, obtain correct noise level at idle, by 2dBA lower than before (meet FOTON target). Complete driveshaft torsional vibration test with EARD equipment, add a new ability. Support Hyundai truck handle acceleration noise, engine abnormal noise, etc. Support CNHTC handle vibration issue, intake noise. Support JAC truck handle new pass-by standard test, vibration for a few vehicle models.

5 2017 Plan and Emphasis Pass-by noise simulation based on VMS.
Create a new CEB for 4-cylinder engine mount system design. Study a method for road load identification. Improve driveshaft torsional measurement for regular use. Optimize to support customers with best effectiveness.