Moldflow Analysis Report

Slides:



Advertisements
Similar presentations
PCBA生產注意事項 QA Rio Chiang Feb. 1,
Advertisements

破舊立新(三) 人生召命的更新 使徒行傳廿六章19-23節.
功夫茶.
“走进三国” 读书汇报会 广州市玉岩中学 李玉明( ).
Priorities of Mold Design
说课.
Chapter 8 Liner Regression and Correlation 第八章 直线回归和相关
SHARE with YOU Why am I here? (堅持……) What did I do?
氣相層析儀操作說明入門 The Introduction of Operation Gas Chromatography
税务认定 永州市国家税务局纳税人学校.
(HyperMesh + HyperView) 2D MESHING
寻找进口商 监测竞争对手 提升企业竞争力
版權所有 翻印必究 指導教授:林克默 博士 報告學生:許博淳 報告日期: 2011/10/24. 版權所有 翻印必究 Results and discussion The crystalline peak at 33° corresponds to the diffraction of the (200)
Moldflow Analysis Report
Thinking of Instrumentation Survivability Under Severe Accident
REVIEW 基本XYZ立體繪圖命令 MATLAB 程式設計與應用 張智星
Mini-SONG & Site testing at Delingha
SPC introduction.
Lotus Domino R7 Designer
Chapter 9 Vapor Power Cycle 蒸汽动力循环
Excellence in Manufacturing 卓 越 制 造
Purposes of Mold Cooling Design
作 業 管 理 指導:盧淵源教授 第四組:碩士專班 N 徐天志 N 林耀宗 N 陳丁雲
Creating Animated Apps (I) 靜宜大學資管系 楊子青
中国散裂中子源小角谱仪 的实验数据格式与处理算法 报告人:张晟恺 中国科学院高能物理研究所 SCE 年8月18日
Properties of Continuous probability distributions
Concentric record grooves
機械波 Mechanical Waves Mechanical wave is a disturbance that travels through some material or substance called the medium for wave. Transverse wave is the.
Origin绘图和数据分析 2006年11月.
XBRL未來發展趨勢 2009年12月 For information on applying this template onto existing presentations, refer to the notes on slide 3 of this presentation. The Input.
產品肉厚的考量 製造生產上的影響 產品性能的影響 補強與防止變形的方法
Coupling TRIGRS and TOPMODEL in shallow landslide Prediction
圖表製作 集中指標 0628 統計學.
Special English for Industrial Robot
边界条件/CFX表达式语言 讲座 3.
Copper Wire Bonding Training 铜线焊线培训
排氣 Vent 為何排氣仍然還是一個問題? Why venting is still a problem ?
參加2006 SAE年會-與會心得報告 臺灣大學機械工程系所 黃元茂教授
瞬态油漆混合器 练习 6.
ANSYS基础与入门.
塑膠材料的種類 塑膠在模具內的流動模式 流動性質的影響 溫度性質的影響
多相流搅拌器 练习 7.
客户服务 询盘惯例.
Chapter 8 Thermodynamics of High-Speed Gas Flow (第8章 气体和蒸气的流动)
2012清大電資院學士班 「頂尖企業暑期實習」 經驗分享心得報告 實習企業:工業技術研究院 電光所 實習學生:電資院學士班  呂軒豪.
热成型塑料基础培训教材.
Study for Specification of EPG EPG规范研究
推动全球能源变革,以创造清洁、安全、繁荣的低碳未来。
高性能计算与天文技术联合实验室 智能与计算学部 天津大学
Chapter 5 Attributes of Output Primitives (图元的属性)
Manitowoc NEO 製冰機 技術訓練課程
SAP FI Module Account Payable Version:2.0版本 Date:2001/10/01 制作: 胡 敏.
3.5 Region Filling Region Filling is a process of “coloring in” a definite image area or region. 2019/4/19.
中国科学技术大学计算机系 陈香兰 2013Fall 第七讲 存储器管理 中国科学技术大学计算机系 陈香兰 2013Fall.
Common Qs Regarding Earnings
爬蟲類動物2 Random Slide Show Menu
Dual-Aircraft Investigation of the Inner Core of Hurricane Nobert
Inter-band calibration for atmosphere
歷代志下.
第九章 摘要.
工數報告 球球與彈簧的華爾滋 河工2B 黃亭嘉 郭宛棋 林于凱 黃乙玲 張舒茹.
【本著作除另有註明外,採取創用CC「姓名標示-非商業性-相同方式分享」臺灣3.0版授權釋出】
Yang, Y., and Y.-L. Chen, 2008: Mon Wea. Rev., 136,
Yang, M.-J., D.-L. Zhang, X.-D. Tang, and Y. Zhang, J. Geophys. Res.
熱澆道系統的安裝使用 2009.
怎樣把同一評估 給與在不同班級的學生 How to administer the Same assessment to students from Different classes and groups.
多维阅读第4级 Food for Zebras.
Example for CIC Report CIS-I.
For increase module power efficiency.
When using opening and closing presentation slides, use the masterbrand logo at the correct size and in the right position. This slide meets both needs.
Presentation transcript:

Moldflow Analysis Report Please press shift+F5 to look at the report Part Name 产品名称: H-LAMELLEN_BFS&FS_LL_T6_AUSSTROEMER_VW Mold Number 模具编号: EBT-01097(O169) Prepared by 报告制作: Larry Xu Date Prepared 日期: Apr. 4th 2014 Version 版本 : Rev.1

Project Summary 分析要求 Analysis Purpose Validate potential problem after the part design 验证可能存在的问题在产品设计完成后 Check the fill balance pattern, weld line, air traps, and predict the needed clamp force and injection pressure, warpage. 指出流动模式,熔接线位置,困气位置,所需锁模力和注塑压力,产品变形 Estimate cycle time 评估周期 Input Model Description The runner system is simulated as the mold design. 根据模具设计建立流道为分析 Result Required Filling result 流动结果 Cycle time result 周期结果 Warpage result 变形结果 Actual of cavities 实际出模数: 10 parts Number of cavity analysis 分析时出模数: 10 parts Part Material 塑胶材料: PA6+50%GF Type of analyses 分析类型: Flow + Warp

Material Data 材料描述 The material datas are from supplier is in moldflow database and shown in the pictures below Material Property PA6+50%GF (Ultramid B3WG10 from BASF) Melt Temperature Range (℃) 270~290 Solid Density (g/cm3) 1.59 Mold Temperature Range (℃) 80~90 Maximum Shear Rate (1/s) 60000 Ejection Temperature (℃) 165 Maximum Shear Stress (MPa) 0.5 Absolute Maximum Melt Temperature (℃) 290 MFI (g/10min) ( ℃/ Kg) / Recommended Melt Temperature (℃) 280 Filler 50% GF Recommended Mold Temperature (℃) 80 Rheology: PVT properties:

Part、Tool、Setup 产品信息及成型参数设置 Process Setup 成型设置 Part Details and Tool Description 产品和模具描述 Part Name:产品名称 H-LAMELLEN_BFS&FS_LL_T6_AUSSTROEMER_VW CAD File / Version/ Date 模型格式和版本 H-LAMELLEN_BFS&FS_LL_T6_AUSSTROEMER_VW /stp/2014.3.21 Part Volume 产品体积 51 cm^3 Nominal Wall Thickness 产品平均厚度 3.2 mm Tool Description 出模数 10 Cavities Injection machine Tonnage 注塑机台 / Process Setup 成型设置 Material 塑胶材料 PA6+50%GF (Ultramid B3WG10 from BASF) Injection time 注塑时间 1.5 s Material temp 材料温度 280 [deg.c] Mold temp 模具温度 80 [deg.c] Velocity/Pressure Transfer (% volume) 转保压体积 98 % Packing Pressure 保压压力 80% filling pressure / 8 s, 80% filling pressure / 4 s Project Area 产品投影面积 204 cm^2

Wall thickness 产品厚度 This above plot used different color to show the thickness of this part. We can see that: the average thickness of this part is about 3.2 mm. 平均厚度 3.2 mm Total part weight = 78 g, the cold runners weight = 18 g 产品重量 78 g, 冷流道重量 18 g

Gate Location and size 流道布局 Hot runner system Dia. 2 mm Edge gate (typical 10) Dia. 1.5 mm No. Diameter (mm) Depth blue 3.5 Yellow 6 Pink 5.5 Green 4.5 Blue 4 Edge gate (typical 10) Dia. 1 mm 流道布局基于DFM报告, 用热流道和边入水填充这个产品 The mold is the hot runner system and edge gate. The runner layout was based on the DFM report.

Preprocess and Mesh statistics 网格统计 Specification: the type of model used for this analysis are dual-Domain and 3D meshes 双层面网格质量一般,使用双层面和3d分析

Simulation results list 分析结果项目 Fill time (Animate & Contour) 填充时间 ( 动态+轮廓) Flow Front Temperature 前端温度 Pressure at the V/P switchover 转保压压力 Pressure at the end of fill 填充末端压力 Injection pressure 注塑压力 Clamp Force 锁模力 Weld lines 熔接线 Air Traps 困气 Time to freeze 产品冷却时间 Volumetric shrinkage at ejection 顶出时体积收缩 Deflection 变形 Conclusions and suggestions 结论和建议

Fill result – Fill animate 动态流动 This result shows how the melt flows through the cavity. Fill time is about: 1.2 sec. Shift+F5, you will see the animated flow

Fill result – Filling Contour 流动轮廓图 The area with dense lines in the above picture represents the area with lower flow velocity; and the area with sparse lines represents the area with higher flow velocity.

Temperature at flow front 前端温度分布 Above figure showed the temperature at the part. Melt enters cavity at 280 C The polymer recommended temperature range: 270~290 C From above plot we can see that the temperature drop on the part are out of this polymer recommend rang and indicate flow relate problem were expected appear on this part, we suggest to injection this part by slow speed.

Pressure at V/P switchover 转保压压力 Above figure shows the pressure distribution through the flow path inside the mold, at the V/P switchover of the filling phase.

Pressure at the end of fill 填充完成时压力 显示填充完时的压力分布情况。 Above figure shows the pressure distribution through the flow path inside the mold, at the of the filling phase.

Injection pressure 压力XY曲线图 The maximum value is 38.8 Mpa, Injection pressure specified at Packing is 31.3 Mpa The filling pressure are within moldflow recommend value which can acceptable. 压力分布结果表明:射胶压力在MF推荐范围内 (38.8 Mpa). Packing profile plot

Clamp force 锁模力XY曲线图 The maximum clamp force is 61.8 Tons. 最大锁模力为 61.8 tonne.

Weld lines locations 熔接线位置 没有熔接线出现在表面。 No weld lines appear on the surface.

Air trapped area 困气位置 The result shows areas of the cavity that may require additional venting, it should be viewed in combination with the filling pattern result. Adding vent 困气位置大部分在流动末端,不存在严重困气,流动末端加排气。 Air traps locations mark in depth blue color. Most of the air trapped appear at the edge of part that is easy to vent.

Time to freeze 产品冷却时间 The result shows the amount of time taken for all of the elements in the part to freeze to ejection temperature. 产品冷却大部分在18 s内 95%冷却, 流道冷却60%需要12 s The time to reach ejection temperature is about 18 s for 95 % melt volume freezed, the cold runner is about 12 s for 60 % melt volume freezed

Volumetric shrinkage at ejection 产品体积收缩 没有的缩痕出现在产品表面 No sink marks appear at the surface. The maximum shrinkage at ejection is 7.3 %.The minimum shrinkage at ejection is 1.6 %.

Deflection-All 产品整体收缩+变形,放大3倍 Note : warpage shape magnified 3X for display purposes. (The undeformed part display transparent) 产品整体最大变形 +缩水在红色区域 0.09 mm, The maximum shrinkage and deflection value is about 0.09 mm.

X-deflection 产品X方向变形,放大3倍 Note : warpage shape magnified 3X for display purposes. (The undeformed part display transparent) 产品X方向最大变形 +缩水在红色和深蓝色区域 -0.09~0.07 mm, The black arrow indicates the shrinkage and deflection moved inward about 0.09 mm. The red arrow indicates the shrinkage and deflection moved inward about 0.07 mm.

Y-deflection 产品Y方向变形,放大3倍 Note : warpage shape magnified 3X for display purposes. (The undeformed part display transparent) 产品Y方向最大变形 +缩水在红色和深蓝色区域 -0.06~0.08 mm, The black arrow indicates the shrinkage and deflection moved inward about 0.06 mm. The red arrow indicates the shrinkage and deflection moved inward about 0.08 mm.

Z –deflection 产品Z方向变形,放大3倍 Note : warpage shape magnified 3X for display purposes. (The undeformed part display transparent) 产品Z方向最大变形 +缩水在红色和深蓝色区域 -0.03~0.03 mm, The black arrow indicates the shrinkage and deflection moved downward about 0.03 mm. The red arrow indicates the shrinkage and deflection moved upward about 0.03 mm.

Conclusions &Suggestions From the above analysis The cycle time is about: 1.5 (filling) + 18.0 (cooling + packing ) + 8.0 (open & eject) =27.5 sec This part will not have filling problem due to the pressure are within the moldflow recommend range. No weld lines were expected appear at this part. (refer page 16) Most of the air trapped appear at the edge of part that is easy to vent. (refer page 17) No sink mark appear at the surface of part. (refer page 19) This part have minimal uneven shrinkage at the X,Y,Z deflection. Fill time Injection pressure Volumetric shrinkage 1.5 sec 38.8 Mpa 1.6~7.3 % Deflection: X Component Y Component Z Component -0.09~0.07 mm -0.06~0.08 mm -0.03~0.03 mm