Presentation is loading. Please wait.

Presentation is loading. Please wait.

2019年1月2日星期三 CAST.

Similar presentations


Presentation on theme: "2019年1月2日星期三 CAST."— Presentation transcript:

1 2019年1月2日星期三 CAST

2 IC Design Management Content Definition Taiwan IC Industry Position
Infrastructure Application Solution Scope Features Q & A Reporter : 陳人豪/翁民賢 2019年1月2日星期三 filename\location

3 IP Intellectual Property Factor: Description
Process: .5um, .035um, …etc. Type : Behavior, RTL, Gate(netlist), GDS Area: mil Size: W*H Version: Analog or digital or mix-mode Category: Memory, Controller, Processor, Mathematic, Coding, Application specific, etc. 2019年1月2日星期三 CAST

4 Chip An IC, SoC System on chip (SoC) design in the billion-transistor era will involve the integration of numerous heterogeneous semiconductor intellectual property (IP) blocks. Factor: Pin count Voltage Package 2019年1月2日星期三 CAST

5 IC產業發展前景 資料來源:工研院經資中心 (2002/08) 2019年1月2日星期三 CAST

6 Software Evolution Provider
CAST is Solution Provider e-Business Integration e-Collaborative Products CAST is Software Evolution Provider SmePDM Arco PDM IC Design PDM 2019年1月2日星期三 CAST

7 Successful Stories Electronics Industry Automobile Industry
IC Design Industry 3C Industry Manufacture Industry Information Agency 2019年1月2日星期三 CAST

8 Fabless IC Design Fast to Market 如何最快速的將產品推進市場? 如何沿用既有設計降低開發風險?
如何最快速的評估取代方案? 如何準確預估開發成本? More Focus 如何精確掌控委外開發進度? 如何迅速檢視專案現狀及決策? Product Evolution 如何掌握問題回報及處理? 如何管理產品版本及發行? 2019年1月2日星期三 CAST

9 Infrastructure IC Design on Demand Platform 2019年1月2日星期三 CAST

10 Infrastructure(continued)
IP Souring 管理 IP 構型管理 專案規劃管理 設計文件管理 設計流程管理 IC Design On Demand 前段設計 規格制度 RTL執行 與發展 模擬 合成 功能驗證 平面配置 佈局與繞線 LVS驗證 系統設計 後段設計 Issue 管理 2019年1月2日星期三 CAST

11 Proposal Phase DR0 Proposal DR1 Protocol DR2 Algorithm DR3
Architecture Project Kick Off Continued Input Actor Output Actor Product Proposal Document Review Meeting Minutes Process Control Module Product Lifecycle Promotion Request for Proposal (RFP) Invitation to Quote (ITQ) Document Control Module Document Release IP BOM Management Module 2019年1月2日星期三 CAST

12 Protocol Phase DR0 Proposal DR1 Protocol DR2 Algorithm DR3
Architecture Project Kick Off Continued Input Actor Output Actor Product Protocol Document Review Meeting Minutes Process Control Module Product Lifecycle Promotion Protocal 驗證報告 Cost/Price成本分析表 Protocol System Spec 人力評估 Document Control Module Document Release IP Number Request IP BOM Plan IP BOM Management Module IP BOM Builup 2019年1月2日星期三 CAST

13 Algorithm Phase DR0 Proposal DR1 Protocol DR2 Algorithm DR3
Architecture Project Kick Off Continued Input Actor Output Actor Product Algorithm Document Review Meeting Minutes Code Review Process Control Module Product Lifecycle Promotion Algorithm Spec Verification Report Validation Report Document Control Module Document Release RTL Code IP BOM Management Module Code Secured 2019年1月2日星期三 CAST

14 Architecture Phase DR0 Proposal DR1 Protocol DR2 Algorithm DR3
Project Kick Off Continued Input Actor Output Actor Product Architecture Document Review Meeting Minutes Code Review Process Control Module Product Lifecycle Promotion Architecture Spec Verification Report Document Control Module Document Release NetList Code IP BOM Management Module Code Secured 2019年1月2日星期三 CAST

15 Product Implementation
Implementation Phase DR4 Implementation PP0 Fab Project Kick Off Continued Input Actor Output Actor Product Implementation Document Review Meeting Minutes Code Review Process Control Module Product Lifecycle Promotion Testbench Report Verification Report Synthesis Report Document Control Module Document Release Labeling Request IP BOM Management Module Label Generated 2019年1月2日星期三 CAST

16 IPBOM - Combination Library pool MP3 V1.0 A B C A B D E C D E C
2019年1月2日星期三 CAST

17 IPBOM - Revise MP3 V1.0 MP3 V2.0 A B A1 B1 C D K D E E1 C K
2019年1月2日星期三 CAST

18 IPBOM - BOMCopy MP3 V1.0 VideoPhone V1.0 A B A H C D C D E C
2019年1月2日星期三 CAST

19 IP Sourcing Management
IP BOM Management IP Structure Management IP Alternative / Substitute IP BOM Plan IP Sourcing Management IP Search IP Register IP Reference 2019年1月2日星期三 filename\location

20 Issue Management Design Flow Management New IP Develop Request
IP Revise Request IP Copy Request IP Publish Request IP Expire Request Issue Management Issue Report Issue Handle Issue Fix Publish 2019年1月2日星期三 filename\location

21 Project Management File Management Project Plan Resource Plan
Progress Trace & Report File Management Revision Control Access Control Download Log 2019年1月2日星期三 filename\location

22 Solution Scope IP Content IC Design on Demand Manufacture IP Mall
IP Sourcing And Service IP Search IP Register IP Reference IC Design on Demand IP Content Design Mall IP Designer Design House Product House 2019年1月2日星期三 CAST

23 Features 以中央控管的機制管制資訊的版本問題 增加IP的重複使用性(Reuse), 降低研發成本與時間
設計研發文件皆確實地納管於系統中, 有助於知識分享. 以議題處理控管的方式減少問題重複發生的頻率 以流程控管的方式來管制設計資訊的一致性 以專案中心控管的方式所提供的設計活動進程管理 以系統整合的方式解決現有流程管控 2019年1月2日星期三 CAST

24 Q & A Reporter :陳人豪/翁民賢 TEL : / 2019年1月2日星期三 CAST


Download ppt "2019年1月2日星期三 CAST."

Similar presentations


Ads by Google